• BOQ and BOM

BOQ (bill of quantities) is documented and used in itemizing parts, material and labor costs. The terms and conditions can be detailed for the repair contracts. The works are itemized by us which can enable in pricing the work for the projects where bidding can take place. The BOQ is prepared by our surveyors who provide an itemized trade list that would be having the required quantity and description of every component. All the items needed would be looked in by us and we examine the required materials in a construction project in all the aspects. The main aim of performing BOQ by us is to define the projects such that the project can be defined to estimate the price. Final documents are made which would be listing the things needed for building along with the costs estimated. The BOM (bill of materials) needed for product structure are billed based on the essential assemblies and the sub components. The quantity of each item needed for the manufacture are estimated and produced to the partner through clear communication.